A model of the boat i am building, scale 1/10. Length approx. 16.5'.

Norsk English

Date  

The plan and preparation
June 6. 2004 The frames are set up.
June 12. 2004 Laminating the keel and bow.
June 17. 2004 The stringers are in place.
June 20. 2004 First layer of the bottom.
June 26. 2004 First layer of the sides.
June 30. 2004 2'nd layer of the bottom.
July 5. 2004 2/3 of the 2'nd layer of the sides.
July 16. 2004 Outer part of the boat is covered with glass fiber and Epoxy
July 17. 2004 The boat is on wheels.
July 18. 2004 The boat is turned the right way.
July 19. 2004 More pictures of the boat after it is turned.
August 2. 2004 Preparing the stringers before glassing of the inside of the bottom.
August 22. 2004 The inside of the bottom is covered with glass and Epoxy.
August 23. 2004 3'rd layer of the transom was not properly laminated..
August 24. 2004 New layer of plywood on the transom.
August 29. 2004 Glassing the inside.
September 11. 2004 Inserting bulkhead 1 and 3.
September 18. 2004 Filling the void in front of bulkhead 1 with Styrofoam.
September 19. 2004 Preparing for the forward deck.
September 23. 2004 The first layer of the for deck.
September 29. 2004
Working on the motor well.
October 3. 2004 Working on the stern.
October 9. 2004 The stern has got its final shape.
October 12. 2004 Covering the transom with glass.
October 23. 2004 Resting for the winter.
February 12. 2005
Winter
April 19. 2005 The spring is here.
April 30. 2005
Fairing the bottom
May 7. 2005
Fairing and sanding the bottom
May 16. 2005
Covering the bottom and sides with epoxy
May 22. 2005
Working up-side down inside the boat
June 1. 2005
Glassing the seam between the deck and the sides
June 20. 2005
The for deck
June 30. 2005
Wind screen
July 2. 2005
Test launch
July 30.2005
Petrol tank and cabin sole
August 15. 2005
Hole in cabin sole
September 1. 2005
Laying the cabin sole
September 4. 2005
Bulwart
October 8.  2005
Launch